Thick, black tar is used for damp-proofing the back of the newly-poured concrete backwalls. It is applied ahead of the 'lifts' of backfill used to bring the roadbed back to grade after completion of the backwalls. Lifts are one-foot deep dumps of backfill material, compacted using a mechanical compactor ahead of the next lift (marked by the orange lines on the backwall). |
Date:
2/28/2008 |
Location:
Plainfield, NJ Map ![Show Plainfield on a rail map](/images/map_us.gif) |
Views:
245 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Dave Abeles |
|
Author: David Abeles
|
![Damp-Proofing](http://s3.amazonaws.com/rrpa_photos/22959/Liberty%20backfill.JPG) |
Picture Categories: |
This picture is part of album: So, you want to replace a railroad bridge... |