Making the run around at the westerly end of the current 5 miles of track under operation. Aaout 500 feet further to the right is a long road crossing which needs to be rebuilt before trains can travel further towards Green Lake the planned eventual destination. /DL |
Date:
7/31/2010 |
Location:
Ellsworth Falls, ME Map ![Show Ellsworth Falls on a rail map](/images/map_us.gif) |
Views:
329 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
Locomotives: |
Author: David Larrabee
|
![DSRX 54 making the run around](http://s3.amazonaws.com/rrpa_photos/60437/2010%2007%2031%20DSXR%20Opening%20Day%20Operations,%20Ellsworth,%20Me%20020%20(2).JPG) |
Picture Categories: Roster,RollingStock,Yard,Station,Passenger,Action |
This picture is part of album: DSRX - Summer '10 |