Back in 2011, this interlocking was a spring switch. Two years later the spring was removed as was this automatic. A new three head signal was installed here and a mast signal with two heads replaced the dwarf for southbound moves. |
Date:
8/18/2011 |
Location:
Putney, VT Map  |
Views:
87 |
Collection Of:

Bob Beaumont |
|
Author: Bob Beaumont
|
 |
Picture Categories: Signal,Track |
This picture is part of album: NECRE PALMER SUB |