The switch box was completely disassembled and cleaned/refinished. The box is awaiting reproduction labels that will match the originals. New fuses applied and shunts rewired with Exane 1069A. |
Date:
12/5/2018 |
Location:
Omaha, NE Map ![Show Omaha on a rail map](/images/map_us.gif) |
Views:
297 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Michael Koehler |
Locomotives: |
Author: Michael Koehler
|
![Control Stand Switch Box Restoration](http://s3.amazonaws.com/rrpa_photos/94663/Switch%20Box%20Restored.JPG) |
Picture Categories: InCab |
This picture is part of album: LIRR 467 Restoration |