MA 2 has cleared the Valley Interchange track. The conductor is aligning the switch so the train can back up and pull covered hoppers out. The old CNJ Station is visible and other railfans also present. |
Date:
6/29/2022 |
Location:
Bound Brook, NJ Map ![Show Bound Brook on a rail map](/images/map_us.gif) |
Views:
96 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Steve Coraggio |
Rolling Stock: |
Author: Steve Coraggio
|
![Conductor Aligning the Switch](http://s3.amazonaws.com/rrpa_photos/145195/DSC_0226.JPG) |
Picture Categories: Roster,RollingStock,Yard,Station,Track,Action |
This picture is part of album: MA-2 Works Bound Brook Yard and Heads West |