Part one-pulling half of the flats to the ramp out of the Strates yard. It usually takes four to six hours to assemble this train based on the numerous switching & wye moves. |
Date:
5/31/2007 |
Location:
Taft, FL Map ![Show Taft on a rail map](/images/map_us.gif) |
Views:
755 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Kevin Andrusia |
Locomotives: |
Author: Kevin Andrusia
|
![P904 James Strates Train](http://s3.amazonaws.com/rrpa_photos/19762/CSXT8731-2.JPG) |
Picture Categories: |
This picture is part of album: Florida Color 2007 |